企业级数智化电能

解决方案

DIGITAL ENERGY SOLUTION

Online monitoring of cable metal sheath current
Online monitoring of cable metal sheath current

Online monitoring of cable metal sheath current

Get solution

 

 

 

Overview
——————

 

 

Cable metal sheath grounding current monitoring is achieved by installing a grounding current collection device on the grounding wire of the cable sheath, effectively monitoring the leakage status of the grounding current, and achieving real-time monitoring of the cable grounding current through the grounding current collection main station installed in the monitoring center; Once a cable failure occurs, causing an increase in ground leakage current, the system will immediately issue an alarm to prompt relevant personnel to handle the cable fault in a timely manner.

 

 

 

 

Overview
——

Cable metal sheath grounding current monitoring is achieved by installing a grounding current collection device on the grounding wire of the cable sheath, effectively monitoring the leakage status of the grounding current, and achieving real-time monitoring of the cable grounding current through the grounding current collection main station installed in the monitoring center; Once a cable failure occurs, causing an increase in ground leakage current, the system will immediately issue an alarm to prompt relevant personnel to handle the cable fault in a timely manner.

 

 

 

     

                 

System composition
——————

The protective layer grounding current monitoring unit mainly consists of current transformers, acquisition devices, industrial control computers, and background protective layer current monitoring software.

Collection device: The collection mainly realizes the induction and collection of grounding current, and transmits the collected data back to the upper software through the communication link;

Communication link: mainly used to connect the acquisition device with the upper software system, and can form a communication link through 485 bus and industrial Ethernet;

Upper level software system: mainly composed of industrial computers, protective layer current upper level software, printers and other auxiliary equipment.

 

 

      
           

Here is the title one h1 placeholder text

System composition
——

 

Safety Service

 

The protective layer grounding current monitoring unit mainly consists of current transformers, acquisition devices, industrial control computers, and background protective layer current monitoring software.

Collection device: The collection mainly realizes the induction and collection of grounding current, and transmits the collected data back to the upper software through the communication link;

Communication link: mainly used to connect the acquisition device with the upper software system, and can form a communication link through 485 bus and industrial Ethernet;

Upper level software system: mainly composed of industrial computers, protective layer current upper level software, printers and other auxiliary equipment.

 

 

 

Product features
——————

 

 

 

 

 

Product features
——

 

 

 

 

 

 

 

 

Specification parameters
——————

 

 

  

Current collection range
0-100A, customizable

accuracy
0.5 level, 0.2 level, 0.1 level

Collector power supply
24VDC or 12VDC,10W

response time
400ms

communication interface
RJ45 Ethernet port, 485 interface

Expansion interface
3-way cable joint temperature connection or 3-way line current connection

Specification parameters
——

 

Current collection range
0-100A, customizable

accuracy
0.5 level, 0.2 level, 0.1 level

Collector power supply
24VDC or 12VDC,10W

response time
400ms

communication interface
RJ45 Ethernet port, 485 interface

Expansion interface
3-way cable joint temperature connection or 3-way line current connection

Related Cases


Xi'an Longji Leye Photovoltaic Cable Testing Project

Xi'an Longji Leye Photovoltaic Cable Testing Project

Partial discharge detection project for 35kV cable heads and substation equipment of Chengdu Metro

Partial discharge detection project for 35kV cable heads and substation equipment of Chengdu Metro

For more references +

Related Cases


Xi'an Longji Leye Photovoltaic Cable Testing Project

Xi'an Longji Leye Photovoltaic Cable Testing Project

For more references +

Products Recommended



Start the experience of Smart Energy

Get customized solutions today or speak directly with team of how SlTECH can help you.

Start the experience of Smart Energy

Get customized solutions today or speak directly with team of how SlTECH can help you.